Skip to main content

Dashboard Overview

The single-project dashboard opens with a product Overview for engineers, reviewers, leaders, and evaluators who do not already know Fairway's operating vocabulary. The Overview is an orientation and evidence surface, not an operator control room or a marketing landing page.

User Journey​

The page follows five questions in order:

  1. Understand: How does Fairway preserve work as it moves between collaboration and delegation across the delivery lifecycle?
  2. Operate: Is the problem still uncertain, or is one slice bounded and independently verifiable enough for an execution attachment?
  3. Inspect: Can I follow one real work item from intent through outcome?
  4. Trust: Which claims are supported by current project records, and which authority remains elsewhere?
  5. Adopt: Where do I go next for active work, lifecycle evidence, delivery outcomes, control analysis, or diagnostics?

The operational views retain narrower responsibilities:

ViewResponsibility
OverviewExplain the product using current project facts and cited records.
WallShow live provider lanes, handoffs, gates, and activity.
BoardNavigate and manage bounded work items.
QualityCompare lifecycle evidence states across work items.
ReportsExplain what changed during a delivery window.
ControlsMeasure whether recorded controls discriminate outcomes.
DiagnosticsInspect coordination and runtime machinery.

Information Architecture​

Product promise Current project proof
Intent -> evidence -> judgment tracked / evidence / review / done
-> promotion -> outcome |
| |
+--- Cited work-item trace ------+
|
Authority and system boundaries
|
Work / Quality / Reports / Controls

The first viewport establishes the product promise and shows the Quality Record as a connected lifecycle. It must leave the current-project proof visible without requiring the user to understand task statuses or provider sessions.

The operating-model section distinguishes three provider-neutral execution surfaces:

  • a subagent for short work bounded to the current task;
  • a task-specific thread for independent interaction, approval, long waits, or continuity; and
  • a small number of durable control surfaces for recurring cross-task judgment and steering.

It must state that Fairway remains the durable record for all three and that task-specific provider surfaces normally end and are archived after their evidence or handback is recorded. The labels are selection guidance, not new Fairway task states, roles, or automatic session policy. The section must also make clear that material delegated work requires a registered session and that a separate execution surface does not establish reviewer independence; routed reviewer identity and the configured review domain remain authoritative.

The section must not present the surface selector as the whole operating model. It first explains the mode transition: collaborate while intent or proof is uncertain, delegate one bounded slice, verify and challenge the result, and return to collaboration when evidence changes the diagnosis. It states that this loop operates across existing lifecycle stages and does not create a new Fairway task state or SDLC phase.

The proof section uses only current Fairway records:

  • total bounded work items;
  • work items with recorded evidence;
  • work items with recorded review;
  • completed work items; and
  • one recent, evidence-rich task projected through the canonical nine-stage Quality Record.

These are coverage facts, not a quality score or a causal claim.

Authority Boundary​

The Overview must make system ownership explicit:

  • Fairway owns the accountable work record and readiness projection;
  • Git owns source history;
  • CI/CD and deployment systems own execution results;
  • reviewers and accountable operators retain judgment, promotion, and risk authority.

The dashboard remains read-only. It cannot approve, waive, merge, deploy, release, accept risk, or turn missing information into generated narrative.

Routing​

In single-project mode:

  • / renders Overview;
  • /wall renders the operational Wall; and
  • the brand links to Overview.

Multi-project mode keeps / as the project coordination wall because its primary job is aggregation. It does not claim a cross-project Quality Record authority.

Browser Acceptance​

The implementation is accepted when a first-time user can identify, from the rendered page alone:

  • Fairway's product promise;
  • the lifecycle being preserved;
  • when to choose a subagent, task-specific thread, or durable control surface;
  • why provider-surface archival does not remove the Fairway record;
  • current evidence coverage and its limitations;
  • one cited real work item;
  • the external authority boundary; and
  • the correct next view for work, evidence, delivery history, or control analysis.

Desktop validation must confirm that the first viewport is legible at 1440 by 900, navigation does not overlap, lifecycle connections are unambiguous, and all drill-down links resolve. A compact-width check must confirm that content wraps without page-level horizontal overflow; wide evidence structures may scroll only inside their own bounded container.